Test Summary Results

Document Change Control

Version No Date ModifiedIssued ByVersion CommentClickUp Version Time
1.022/4/2026Moataz (Moataz Mustafa)Final Test Summary Results for the full 30-sprint release cycle.

 

List Of Approvers

Name TitleApproved Release No
Tarek Ramadan Software Engineering Director 1.0

Project / Release Information

Release NameQC EngineerRelease Version #
Compliance Management (إدارة الامتثال) Moataz (Moataz Mustafa)  1.0

Team

  • QA: Moataz
  • Developers: Ahmed Youssef, Ahmed Ashraf, Ahmed Elemam
  • Product Owner: Mohsen Wahed
  • Team Lead: Mahmoud Elbadry

 

1. Introduction

 

1.1 Purpose

This Test Summary Report covers the execution results for the Compliance Management module across Sprints 1–30.It highlights the stability of the 4-layer hierarchy, the measurement period synchronization engine, and overall system readiness for government-level auditing

 

1.2 Scope

 This document summarizes results for the following scope delivered across four sprints

  • This document summarizes results for the following key phases delivered across 29 sprints:
  • Phase 1 (Sprints 1–10) – Foundation & Core Hierarchy
  • Initialization of the Master Data layer (التهيئة).
  • Development of Perspectives (مناظير) and Axes (محاور), CRUD, and list views.
  • Establishment of multi-tenant data isolation logic.
  • Phase 2 (Sprints 11–20) – Workflow & Evidence Management
  • Implementation of Standards (معايير) and Requirements (متطلبات).
  • Launch of the Evidence Upload (إرفاق مستندات الإثبات) and validation system.
  • Development of the Requirement Status Transition engine (New -> Under Implementation -> Approved).
  • Phase 3 (Sprints 21–30) – Measurement Engine & Final Analytics
  • Creation of the Measurement Period (فترات القياس) management layer.
  • Deployment of the Synchronization Logic (Master Data vs. Specific Period import).
  • Finalization of the Compliance Dashboard KPIs and Analytics.
  • Full Regression cycle, Load testing for bulk sync, and UAT support for the Product Owner.


Test types executed

  • Functional Testing – Validate the hierarchy, CRUD operations, and business rules.
  • UI Testing – Verify Arabic RTL alignment and label consistency across 4 layers.
  • Integration Testing (UI-level) – Verify data isolation between periods and structural inheritance.
  • Smoke Testing – Mandatory pass after every deployment by the dev team.
  • Sanity Testing – Targeted checks on critical bug fixes in the evidence module.
  • Regression Testing – Targeted re-tests on status transitions and cascading updates.
  • Usability Testing – Verification of RTL layouts and validation message clarity.
  • Load Testing – Performance validation of the "Synchronize" engine with large datasets.
  • UAT Support – Guided verification sessions with the Product Owner.
  • Not executed:
  • API testing, automation testing, and mobile app testing.

Test levels

  • System Testing – end-to-end flows across the 4-layer compliance hierarchy (مناظير، محاور، معايير، متطلبات) and evidence management menus on the Test environment.
  • Integration Testing – interaction between the Master Data layer and Measurement Periods, verifying the synchronization engine and multi-tenant data isolation (via UI).
  • Acceptance Testing – PO sign-off per story during UAT/demo, validating workflows against Ministry of Health and Al-Baha requirements.

Environments & Tooling

  • Environment: Test only (no Stage)
  • Browsers: Chrome (Primary), Edge (sanity)
  • Tools: ClickUp (stories, defects, execution), screenshots/video evidence
  • Evidence: screenshots (Arabic UI), data dictionaries (when provided), story AC

 

2. Test Results Summary

SprintTest Cases PlannedExecutedPassedFailedBlockedObsolete
Sprint 1000000
Sprint 2909090000
Sprint 3373737000
Sprint 4161616000
Sprint 5464646000
Sprint 6888000
Sprint 7666000
Sprint 8000000
Sprint 9888000
Sprint 10232323000
Sprint 11000000
Sprint 12000000
Sprint 13313131000
Sprint 14888888000
Sprint 15000000
Sprint 16000000
Sprint 17000000
Sprint 18000000
Sprint 19000000
Sprint 20000000
Sprint 21000000
Sprint 22000000
Sprint 23000000
Sprint 24000000
Sprint 25000000
Sprint 26000000
Sprint 27000000
Sprint 28000000
Sprint 2922010094600
Sprint 302201401261400
Total7936135932000

 

2.2 Final Test Results Summary

Test Metrics

Test Effort Summary

  • Test effort (in each test sprint) needs to add auto calculation in the dashboard
  • Test effort (total across 7 sprints) = 486 estimated hours (477.25actual)
  • Variance = -8.75hr
  • No. of Executed TCs = 613, deferred TCs = 0
  • TC's Passed = 593, Failed =20, Not executed =0

 

3. Defect Summary & Quality Indicators

3.1 DRE (Defect Removal Efficiency)

 

SprintTester bugs (Pre-Release)PO bugs (Post-Release/UAT)defects transferred from previous sprintsReopen defectsDRE %Notes
Sprint 13000100%

 

Sprint 28000100%

 

Sprint 34000100%

 

Sprint 44000100%

 

Sprint 55000100%

 

Sprint 610000100%

 

Sprint 74000100%

 

Sprint 84000100%

 

Sprint 94000100%

 

Sprint 103000100%

 

Sprint 114000100%

 

Sprint 125000100%

 

Sprint 130000100%

 

Sprint 140000100%

 

Sprint 150000100%

 

Sprint 160000100%

 

Sprint 170000100%

 

Sprint 180000100%

 

Sprint 190000100%

 

Sprint 200000100%

 

Sprint 210000100%

 

Sprint 220000100%

 

Sprint 230000100%

 

Sprint 240000100%

 

Sprint 250000100%

 

Sprint 260000100%

 

Sprint 270000100%

 

Sprint 285000100%

 

Sprint 293000100%

 

Sprint 3016004100%

 

Overall66000100%

 

 

 

SeverityCount
Critical3
High55
Medium18
Low6

 

  

4. Test Analysis (by Environment)

4.1 Environment Notes

  • Testing was conducted exclusively on the Test environment, as no Stage environment was available.
  • Heavy reliance on Smoke and Sanity testing was required after each build from Ahmed Youssef, Ahmed Ashraf, and Ahmed Elemam.
  • Seeded data for the Ministry of Health and Al-Baha was used to ensure multi-tenant isolation rules were respected.

4.2 Constraints / Gaps Observed

  • Absence of formal BRD/SRS: Requirements were largely based on ClickUp AC and PM notes.
  • Action: A finalized data dictionary for the 4-layer hierarchy was created by the QA to serve as the future source of truth.
  • UI Design Gaps: Some synchronization pop-ups lacked final RTL spacing mockups.
    • Action: QA provided annotated screenshots to the developers to fix alignment issues during the stabilization phase.

5. Bugs/defects Log

This dashboard has all bugs found in the release with their status and severity إدارة الامتثال > Testing - إدارة الامتثال > Compliance Bugs117  

6. Recommendations (Lessons Learned)

  1. Environment Standardization
  2. Maintain a shared “golden configuration” (menus, ACLs, parameters) consistently applied to Test before execution.
  3. UI Spec First
  4. Provide a quick Figma/annotated screenshot per UI change to reduce interpretation and rework.
  5. Reusable Data Sets Library
  6. Maintain reusable Arabic/English seed data to speed regression and reduce blockers.
  7. Regression Pack Definition (Manual)
  8. Build a stable “core regression checklist” for:
    • Main structures CRUD
    • Relationships creation + validations
    • Metamodel diagram reflection
    • Search/filter/list/form navigation

7. Conclusion

The Compliance Management (إدارة الامتثال) module has successfully passed through 29 sprints of rigorous manual testing.The core hierarchy flows (مناظير، محاور، معايير، متطلبات) are functionally stable and accurately reflect the compliance needs of government entities.All Critical and High defects have been resolved. The remaining Medium/Low defects are cosmetic or minor usability issues that do not block the core business value of the release.The system is ready for the next phase of deployment and broader stakeholder UAT.